| Project Name |
Construction of NISSIBI Stay Cable Bridge Over Atatürk Dam Reservoir near Adıyaman /Turkey |
| Country of Work |
Turkey |
| Client |
Turkish Republic Ministry of Transport General Directorate of Highways and Motorways
(GÜLSAN İnşaat Turizm Sanayi ve Ticaret A.Ş.) |
| Type of Contract |
Subcontractor |
| Date of Contract |
19.03.2012 |
| Work Completion Date |
2014 |
Work Details
- Stay cable bridge with concrete pylons (H=125m), post-tensioned side spans and steel orthotropic deck at main span [ L=105+400+105= 610 m ]
- Mega Yapı is the sub-contractor for the main contractor regarding the following works and services:
- Check engineering of the available design and construction engineering
- Wind Tunnel Tests
- Stay cable works
- Post-tensioning works
- Structural monitoring
|