Project Name Construction Works for AGIN Stay Cable Bridge Over Keban Dam Reservoir Elazig /Turkey
Country of Work Turkey
Client Turkish Republic Ministry of Transport General Directorate of Highways and Motorways
Type of Contract Main Contractor
Date of Contract 04.01.2012
Work Completion Date 2014
Work Details
  • Stay Cable Bridge [ L=120+280+120= 520 m ] with continuos steel box section and steel pylon
  • Material Quantities Used: 10000 m3 of reinforced concrete, 300.000 m3 of earthfill, 5000 tons of steelwork, 150 tons of stay cable