Toggle navigation
HOME PAGE
ABOUT US
FIELDS OF ACTIVITY
Special Bridge Design and Construction
Post-tensioning Systems
Stay Cable System
Heavy Load Lifting
Repair, Strengthening and Protection
Accessories
PROJECTS
VIDEOS
CONTACT
Büsan Bridge – Turkey
Main Page
Projects
Büsan Bridge – Turkey
Projects
International Airport Terminal – Kuwait
Zaporozhye City Dnipro River Bridge Project – Ukraine
Limanyolu Viaduct – Turkey
Petrovsky Bridge – Russia
Korabelny Bridge – Russia
İzmit Bay South Approach Viaduct & Suspension Bridge – Turkey
Ağın Bridge – Turkey
Nissibi Bridge – Turkey
Qaisar-Laman Roadway Bridges – Afghanistan
Beylerderesi Viaduct – Turkey
Büsan Bridge – Turkey
Ramstore & M3 Bridge – Kazakhstan
Manavgat Bridge – Turkey
Yusufeli Bridges – Turkey
Kayseri-Kırıkkale Roadway Bridges
Botaş Jetty- Turkey
Bahriye Ucok Car Park – Turkey
Yenidalyan Bridges – Turkey
Alakır Bridge – Turkey
1
2
Project Name
Konya Highspeed Railway Footway Overpass Bridge (Büsan Bridge)
Country of Work
Turkey
Client
Arel Construction
Type of Contract
Subcontractor
Date of Contract
17.09.2010
Work Completion Date
February 2011
Work Details
Project covers construction of 418m cable stayed bridge with main span 130m.
Mega Yapı is the general sub-contractor for stay cable works of bridge.
Total stay cable length is around 1100 mt.
×
FIELDS OF ACTIVITY